
Portland Local
Deck Construction Built for Maine Summers and Hard Winters
Woodhouse Builders plans, frames, and finishes decks on time and within budget throughout Greater Cumberland County.
Free estimate
Tell us what you need
Three fields. It reaches a person here, not a call centre.
What Makes a Deck Last in Maine
A deck in Maine is only useful about five months out of the year, which means every board, every fastener, and every post base has to survive seven months of freeze-thaw cycles before you get to enjoy it again. If the framing isn't right the first time, you'll know it by year three. Scotty Woodhouse handles deck installation from the permit application through final cleanup, and he builds to a standard that holds up through a Maine winter without you having to think about it. Call (207) 544-3126 to talk through your project.
Cost on a deck project depends on size, materials, height off the ground, and how much site prep the yard requires. A simple pressure-treated ground-level deck runs far less than a two-story composite deck with built-in stairs and a privacy screen. Composite decking like Trex costs more upfront than treated lumber but typically requires less maintenance over its life. Hardwoods like ipe or mahogany land somewhere between the two in terms of long-term performance, but they demand precise installation to avoid splitting. Every job is different, contact Woodhouse Builders LLC for an accurate estimate.
Why Deck Framing Either Holds or Fails
The boards on top get all the attention, but the frame underneath is what determines whether the structure is safe in year ten.
Material Options
Pressure-Treated, Composite, or Hardwood
Pressure-Treated Lumber
The lowest upfront cost, widely available, and structurally sound when installed correctly. It needs to be sealed every two to three years and will silver-gray if left untreated. Good choice if you want a functional deck without a premium budget.
Composite Decking
Brands like Trex or TimberTech cost more upfront but don't require regular sealing and won't splinter. The surface stays cooler than some hardwoods in direct sun. Boards come in a range of colors and finishes. Solid option for low-maintenance builds.
Hardwood Decking
Ipe, mahogany, and similar species are dense, durable, and visually distinct. They hold up well in coastal climates. Pre-drilling every fastener hole is not optional with hardwoods. Skipping that step causes splitting, and splitting means replacing boards.
Hidden Fastener Systems
Available with most composite and hardwood products, hidden fasteners leave a clean surface with no exposed screw heads. They cost more in labor and materials but eliminate the rust staining you get with face-screw installations over time.
How It Works
From Permit to Final Board
Deck construction in Maine requires permits in most municipalities. We handle that process so you don't have to chase the building department yourself.
- 01
Design and Permit
We measure the site, confirm setbacks and load requirements, draw up the plan, and pull the permit. Most homeowners don't realize the inspection schedule starts before framing.
- 02
Framing and Foundation
Footings go below the frost line, which in Cumberland County means 48 inches minimum. Post bases, beams, joists, and the ledger connection all get set and inspected before any decking goes down.
- 03
Decking, Stairs, and Trim
Boards get laid with proper spacing for drainage, stairs get built to code rise-and-run, and any railing, fascia, or trim work gets finished before we consider the job done.
Deck Project Scope at a Glance
What Woodhouse Builders handles on a standard deck build.
- 01
Permit application and inspection scheduling
- 02
Footing excavation and concrete footings below frost line
- 03
Pressure-treated framing, beams, and ledger installation with proper flashing
- 04
Decking surface installation in your chosen material
- 05
Stairs, railings, and code-compliant baluster spacing
- 06
Site cleanup and final walkthrough with the homeowner
Serving Greater Cumberland County
Woodhouse Builders builds decks throughout the Greater Cumberland County area. If you're in any of the communities below, we can take your call today and schedule a site visit.
- South Portland
- Scarborough
- Cape Elizabeth
- Falmouth
- Yarmouth
- Cumberland Center
- Cumberland Foreside
- Gorham
- Westbrook
- Freeport
- Brunswick
- North Yarmouth
- Standish
- Windham
- Gray
Get Your Deck Project Started
Maine's building season is short. The sooner the permit goes in, the sooner you're on the schedule.