Full Home Remodeling: One Contractor, Start to Finish
Woodhouse Builders manages every phase of your renovation so nothing falls through the cracks.
Free estimate
Tell us what you need
Three fields. It reaches a person here, not a call centre.
What Full Home Remodeling Actually Covers
A full home remodel is not one project. It's a dozen trades coordinated in the right sequence, executed by people who understand how each phase affects the next. Framing decisions affect where plumbing runs. Electrical rough-in determines what your kitchen layout can actually be. When you're hiring a general contractor to manage a complete renovation, the difference between a smooth job and a drawn-out ordeal comes down to whether one person understands all of it, not just their slice. At Woodhouse Builders LLC, Scotty Woodhouse carries the project from the first structural decision to the final finish coat, and he's reachable every day of the week. Call (207) 544-3126 to talk through your scope.
What drives cost on a full home remodel is scope, condition, and material selections, roughly in that order. A straightforward cosmetic renovation covering flooring, paint, and fixtures lands in a very different range than a gut renovation that opens walls, moves load-bearing structure, or addresses decades of deferred maintenance. Homes with plaster walls, knob-and-tube wiring, or uninsulated cavities require more prep before any visible work begins. The finished result is the same either way, a home that functions the way it should and looks the way you want it to, but the path there is different. Every job is different, contact Woodhouse Builders LLC for an accurate estimate.
What We Mean by a Full Renovation
Scope matters more than budget. Know what you're buying before you commit.
Our Process
How a Full Renovation Moves Forward
- 01
Scope and Planning
We walk the property with you, document existing conditions, and build a project scope that covers every phase in order. No vague estimates. You know what's happening, when, and why before anything starts.
- 02
Structural and Mechanical First
Framing, any load-bearing modifications, rough plumbing, and electrical happen before a single finish surface goes in. Getting this sequence right is what keeps the job on schedule and prevents expensive rework later.
- 03
Finishes and Final Walkthrough
Once the bones are solid, we move to carpentry, tile, cabinetry, fixtures, trim, and paint. The final walkthrough is with Scotty. Not a punch-list coordinator who wasn't on the job.
Scope Breakdown
Surfaces and Systems We Typically Rebuild
- 01
Kitchen and Bathrooms
Full gut renovations, cabinetry, layout, tile, plumbing fixtures, and ventilation. The kitchen remodeling and bath are usually the highest-impact rooms and where we focus structural planning first.
- 02
Flooring Throughout
Hardwood, engineered wood, tile, or a mix by room. We handle the full flooring installation after subfloor is confirmed level and sound. Floors installed over a bad subfloor show it within a year.
- 03
Basement Conversion
Many full renovations include finishing an unfinished lower level. Basement remodeling adds livable square footage without touching the footprint, which is often the highest-value addition a homeowner can make.
- 04
Exterior Envelope
Siding, roofing, and trim are part of a complete renovation if they're compromised. We handle exterior siding and roofing in-house, no secondary contractor handoff mid-project.
Why Single-Contractor Management Matters
What to Know Before Hiring Any Contractor for a Full Renovation
Ask Who's Actually on Site
A contractor who subs out every phase isn't managing your project. They're brokering it. Ask directly who will be on your job site each week and who to call when something needs a decision.
Get the Scope in Writing Before Demo Starts
Verbal agreements about what's included collapse the moment an unexpected condition appears behind a wall. A written scope is what you fall back on when someone says 'that wasn't in the quote.'
Understand What Drives Cost Changes
Hidden rot, outdated wiring, and structural surprises are real. A good contractor tells you upfront that these can shift the number, and shows you the evidence before continuing. If a contractor says nothing can surprise them, something will.
Sequence Matters More Than Speed
A project that moves fast in the wrong order costs more to fix than one that paced itself correctly. Finishes installed before moisture is controlled, or tile set before floors are level, fail early and fail visibly.
Start here
Start With a Conversation About Your Project
Full home renovations are complex. The earlier you get a contractor involved in the planning, the fewer expensive surprises show up mid-project. Scotty Woodhouse is available seven days a week.
(207) 544-3126Mon: 00:00–24:00 Tue: 00:00–24:00 Wed: 00:00–24:00 Thu: 00:00–24:00 Fri: 00:00–24:00 Sat: 00:00–24:00 Sun: 00:00–24:00
Or send it in writing
Three fields, thirty seconds
Frequently Asked Questions
How do you sequence a full home renovation to avoid rework?
What conditions inside an older home typically add to the scope of a full renovation?
Can a full home remodel be completed while the homeowner is living in the house?
How is a full home remodel different from a whole-home renovation?
What permits does a full home remodel require in Maine?
Ready to Talk Through Your Full Home Remodel?
Scotty Woodhouse is available every day of the week.